1. Inspection and Supervision : Gas, Refinery and Petrochemical Plant

Client
Project
Description
Period
Korea Gas
Corporation
LNG Receiving Plant

Third party inspection, Site
supervision and QC a. Welding
inspection b. NDE supervision
c. Piping installation

May.1995 ~
Sep.1995
 SK Corporation
ULSD Project

Third party inspection of Piping
and Tank

Jul.1996 ~
Dec.1998

 HDEC
Libya - Attahaddy
Gas Project (ATAS)
Supervision of piping and tank and
QA/QC at site Gas Piping, Tank and
Equipment
Dec.2000 ~
Aug.2005
Toyo En¡¯g
Brazil - Petrobras
Gabiunas Gas Project
Third party inspection of such items
as piping, tank etc. by Korean
Manufacturer
Jan.2001 ~
Oct.2001
HDEC(Agip)
Iran - South Pars
Phase 4 & 5 (A - ONE)
Supervision of piping and tank,
QA/QC at site for component gas
plant facilities
Apr.2003 ~
Sep.2006
 Sodiff Advanced
Materials
Sodiff adding Youngju
Plant
Third party inspection of Pressure
Vessel
Jan.2004 ~
Dec.2005
TIJD

Iran - South Pars
Phase 6,7&8

Supervision of piping and tank,
QA/QC at site for component gas
plant facilities
Oct.2004 ~
Mar.2007
HDO/HDEC U.S.A - HDO Clean
Fuels Project
Third party inspection of Air
Condenser, Air Cooler
Dec.2004 ~
Jun.2005
HDO/HDEC Netherlands - HDO
Clean Fuels Project
Third party inspection of Boiler, Feed
Water Pump
Dec.2004 ~
Jun.2005
HDO/HDEC Japan - HDO Clean
Fuels Project
Third party inspection of Feed Pump,
Valve, Motor
Dec.2004 ~
Jun.2005
Exxon Mobil
(Poonglim
Industrial)
Russia, Turkey,
France - Sakhalin
Decastri (Export
Terminal Project)
Third party inspection of Incinerator,
Air Conditioner, Chiller, Exhaust Duct
& Fan, Air Cooler, Blower, Pressure
Vessel
Mar.2005 ~
Dec.2005
SK Corporation SK Ulsan Harbor
BUOY Facility
Third party inspection of Tank &
Equipment
Mar.2005 ~
Present
SKICO(HDEC) SK No.2 FCC Project
Expediting / Third party inspection of
Tank & Equipment, Air Cooler
Dec.2006 ~
Present
Daewoo
Engineering
Daesan-GSC GDC Project
Expediting / Third party inspection of
Tank & Equipment, Pressure Vessel
Mar.2007 ~
Present
E-Tech DongYang
Poly-sillicon
Expediting / Third party inspection of
Tank, Rotating Equipment, Pressure Vessel
Aug.2008 ~
Present

2. Inspection and Supervision : Power Plant

Client
Project
Description
Period
POSCO
LNG HRSG

Supervision and inspection Piping,
Super heater, Piping & Tank and etc.

Jan.1999 ~
Dec.1999
 BBC Korea
Boryung Thermal
Power Plant

Welding inspection of Generator,
Boiler & Tube and etc.

Jun.1996 ~
Jun.2003

 BC Hydro
Stave Fall Substation
Third party inspection Generator,
Transformer and etc.
May.1995 ~
Jun.1998
Black & Veatch
Milford, Summersville,
Gateway and Lindsay
Power Plant
Third party inspection of Generator,
Boiler and etc.
Jan.2001 ~
Jun.2001
Alstom
U.A.E - Al Hidd Power
Plant
Third party inspection Generator,
Boiler & Tube, Valve and etc.
Sep.2001 ~
Sep.2003
 BC Hydro
Canada - Stave Fall
Substation
Third party inspection of Generator,
Boiler, Valve etc.
Jan.2001 ~
Jun.2001
BC Hydro

Taiwan - Stave Fall
Substation

Third party inspection of Transformer,
Panel
Nov.2004 ~
Feb.2005
BC Hydro China - Stave Fall
Substation
Third party inspection of Motor, Panel
Nov.2004 ~
Feb.2005
Riley Power China - Boiler
Third party inspection of Tube, Boiler
Casing Pipe, Pressure Vessel
Dec.2005 ~
Present
POSCO Finex Heat Combined
Expediting & Third party of inspection
of HRSG, Machinery, Steel structure
Jan.2006 ~
Present
ROTEM Uljin Nuclear
Power Plant Unit 5&6
Expediting & Third party inspection
of Machinery, Turbine/Generator
Aug.2006 ~
Nov. 2007
Samsung
Everland
Tangjung Heatcombined Plant
Third party inspection of Generator,
Boiler, Piping
Apr. 2008 ~
Present
Samsung
Everland
Ulsan Heatcombined Plant
Expediting & Third party inspection
Of Pressure vessel, Piping
May. 2008 ~
Present

3. Inspection & Supervision : Steel Bridge & Steel Building

Client
Project
Description
Period
POSCO
Incheon International Airport

Supervision of Fabrication and Erection Steel structure

Apr.2000 ~
May.2003
 Korea Highway Corporation
Seohae Grand Bridge Construction (7.8Km)

Supervision of Mechanical work,
Mechanical component of Steel bridge

Apr.1996 ~
Oct.2000

 Korea
Highway
Corporation
Andong - Jaecheon Highway Construction (Joongang Expressway)
Supervision of Mechanical work,
Mechanical component of Steel bridge
Jul.1996 ~
Jul.1999
Uigeongbu City
National Road No.3
Supervision of Fabrication and Erection Steel bridge
Sep.1999 ~
Jan.2000
Ulsan City
Mipo - Onsan Road Construction Project
Inspection for the Fabrication and Erection of Box girder
Aug.2000 ~
Dec.2001
 Korea Highway Corporation
Kumi - Kumho Highway Construction (Seoul -Busan Expressway)
Supervision of Mechanical work,
Mechanical component of Steel bridge
Nov.2001 ~
Feb.2002
Korea Highway Corporation

Daegu - Pohang Highway Construction

Supervision of Mechanical work,
Mechanical component of Steel bridge
Jan.2002 ~
Oct.2004
POSCO Incheon International Airport Rail Bridge
Supervision of Fabrication and Erection Rail bridge, Box girder
Jan.2003 ~
Dec.2003
Daejon Regional Construction Management Office
Umsung - Saenguek Road Expansion
Supervision of Mechanical work,
Mechanical component of Steel bridge
Mar.2003 ~
Sep.2004
Daelim Industrial Yeunyook Bridge of Noryuck Island
Inspection for the Fabrication and Erection of Steel bridge
Feb.2004 ~
Jan.2005
Korea Highway Corporation Third building Construction Area of Daegu - Pohang Highway Construction
Supervision of Mechanical work,
Mechanical component of Steel bridge
Mar.2004 ~
Aug.2004
Dongil Engineering Consultants Machang Grand Bridge
(Gwysan - Yanggok)
Supervision of Mechanical work,
Mechanical component of Steel bridge
Nov.2004 ~
Present
Daewoo Engineering Kwangyang Harbor Road Construction
Inspection for the Fabrication and Erection of Box girder
Nov.2005 ~
Apr.2006
Daewoo E&C Shindorim Multi Building
Erection Supervision of Steel structure
Jun.2005 ~
Present
Korea Highway Corporation Supervision of Steel Bridge (First Area)
Supervision of Mechanical work,
Mechanical component of Steel bridge
Jun.2006 ~
Present
Busan city Myeongji Grand Bridge
Fabrication & Erection Supervision of Steel bridge
Apr.2007 ~
Present
Lotte Construction Geogum Grand Bridge
Fabrication & Erection Supervision of Steel bridge
May.2008 ~
Present
Daewoo
Engineering
Geogum Grand Bridge
Fabrication & Erection Supervision of Steel bridge
Oct.2008 ~
Present

4. Inspection and Supervision : Iron & Steel Making and Other Project

Client
Project
Description
Period
POSCO
U.S.A, Mexico,
Philippine, Germany,
France, U.K - POSVEN

Third party inspection of Compressor,
Motor Tower, H/Exchanger, Valve,
Pressure Vessel Drum, Steel
Structure, Piping, Generator, Blower,
Pump

Dec.1997 ~
Dec.1999
 POSCO
China - ZPSS
Expansion Project

Expediting & T.P.I of Feeder, Burner,
Air Compressor, Crane & Hoist, Pump,
Bag Filter, Cooler, Steel Structure,
Vessel & Tank, Hydraulic System, Fan,
Chiller & etc

Mar.2003 ~
Present

 Chang Won
Special Steel
AOD Steel Making
Plant
Expediting & Third party inspection of
Machinery, Steel structure
Feb.2005 ~
Jun.2006
POSCO
Finex Plant
Third party inspection of Machinery,
Steel Structure
Jul.2005 ~
Oct. 2008
POSCO
China - HV Mill
Third party inspection of Pressure
Vessel, Steel Structure, Machinery
Oct.2005 ~
Dec. 2007
 POSCO
Italy - HV Mill
Third party inspection of Motor,
Transformer, Panel, Pump
Oct.2005 ~
Feb. 2007
POSCO

Finland - HV Mill

Third party inspection of Motor
Oct.2005 ~
Feb. 2007
Se-Ah Besteel Bloom CCM
Third party inspection of Machinery
Feb.2006 ~
Aug. 2007
POSCO Ukraine - Forging Plant
Expediting & Third party inspection of
Press Machinery
May.2006 ~
Dec. 2007
Se-Ah Besteel Steel Making Plant
Expediting & Third party inspection of
Ladle Cranes
Apr.2006 ~
Present
K.Z Engineering China - Dalian Uni Project
Expediting & Third party inspection of
Press Machinery
Dec.2006 ~
Present
Hyundai Steel Dajin Integrated Steel Plant
Expediting & Third party inspection of
Machinery
Jan.2008 ~
Present
POSCO(Thai) #3 Coil Center
Shop inspection of domestic fabricated Machinery
Jun.2008 ~
Present
Asia steel Pyeongtaek Oil Tank
Shop inspection of domestic imported Machinery
Aug.2008 ~
Present
Se-Ah Besteel 15,000 ton Forging Press Shop
Inspection and Expediting service
Sep.2008 ~
Present

5. Manpower Supply : Shipbuilding & Offshore Facilities

Client
Project
Description
Period
Hyundai
Heavy
Industries
Shipbuilding

Containerships, L.N.G Carriers,
FPSOs, Oil Tankers,
Chemical Tankers

Mar.2002 ~
Present
 Samsung
Heavy
Industries
Shipbuilding

Containerships, L.N.G Carriers,
FPSOs, Oil Tankers,
Chemical Tankers

Jan.1998 ~
Jul.2008

 STX
Shipbuilding
Shipbuilding
Containerships, L.N.G Carriers,
FPSOs, Oil Tankers,
Chemical Tankers
Apr.2005 ~
Present
SPP
Shipbuilding
Shipbuilding
Containerships, L.N.G Carriers,
FPSOs, Oil Tankers,
Chemical Tankers
Oct.2005 ~
Present
Hyundai
Samho Heavy
Industries
Shipbuilding
Containerships, L.N.G Carriers,
FPSOs, Oil Tankers,
Chemical Tankers
Apr.2006 ~
Present
 Daewoo
Shipbuilding &
Marine
Engineering
Co., Ltd.
B.P Thunder Horse
Semi - Submersible Rig
(British Petroleum)
Offshore Facilities
Apr.2002 ~
Feb.2004
Daewoo
Shipbuilding &
Marine
Engineering
Co., Ltd.

Sanha Condensate
Complex Platform
(Chevron Texaco)

Offshore Facilities
Oct.2001 ~
May.2004
Hyundai Mipo
Ship-Building
Shipbuilding
Containerships, Bulk Carriers,
Chemical Tankers
Apr.2008 ~
Presen

6. Manpower Supply : Gas, Refinery and Petrochemical Plant (Construction Site)

Client
Project
Description
Period
HDEC
(Sirte Oil)
Libya - Attahaddy Gas
Project (ATAS)

Gas Piping, Tank, Equipment

Dec.2000 ~
Aug.2005
 HDEC
(Total )
Iran - South Pars Phase
2 & 3 (STAS)

Gas Piping, Tank, Equipment

Dec.2000 ~
Sep.2002

 HDEC
(Agip)
Iran - South Pars Phase
4 & 5 (A - ONE)
Gas Piping, Tank, Equipment
Apr.2003 ~
Sep.2006
Hyundai
Petrochemical
Netherlands Fuel
Oil Plant
Third party inspection of Boiler,
Pump
Jan.2005 ~
Dec.2005
KH Petrotec
(Doojung)
India - F.C.C Shut Down
Gas Piping, Tank, Equipment
Sep.2005 ~
Nov.2005
 Samsung
Engineering
Samsung Petrochemical
Expediting & Third party inspection
of Pressure Vessel, Heat Exchanger
Jun.2006 ~
Present

7. Manpower Supply : Industrial Facilities (Construction Site)

Client
Project
Description
Period
Ebara Japan
Vietnam - Tangnong
Water Treatment Plant

Third party inspection of equipment
and material Piping, Tank, Valve and
Equipment

Jun.2003 ~
Dec.2003
 Nowon Industrial
Taiwan - High Speed
Rail Project

Supervision of fabrication and
erection steel bridge

Sep.2003 ~
Feb.2005

 HDEC
Hongkong - HCT9
Supervision of mechanical work
Mechanical component of harbor
unloading facilities
Sep.2003 ~
Apr.2004
Kolon E&C
Vietnam - Thang Long
North Van Infrastructure
Development Project
Third party inspection of Vacuum
Tank, Surface Washer, Tower,
Neutralization Unit, Fan, Pump,
Thickener, Valve, Mixer & etc.
Jun.2004 ~
Jan.2005

¡¡