1.
Inspection and Supervision : Gas,
Refinery and Petrochemical Plant
|
|
Client
|
Project
|
Description
|
Period
|
|
|
|
|
Korea Gas
Corporation |
LNG Receiving Plant
|
Third party inspection,
Site
supervision and QC a. Welding
inspection b. NDE supervision
c. Piping installation
|
May.1995 ~
Sep.1995
|
|
SK Corporation |
ULSD
Project
|
Third party inspection
of Piping
and Tank
|
Jul.1996 ~
Dec.1998
|
|
HDEC |
Libya - Attahaddy
Gas Project (ATAS)
|
Supervision of piping
and tank and
QA/QC at site Gas Piping, Tank and
Equipment
|
Dec.2000 ~
Aug.2005
|
|
Toyo En¡¯g |
Brazil - Petrobras
Gabiunas Gas Project
|
Third party inspection
of such items
as piping, tank etc. by Korean
Manufacturer
|
Jan.2001 ~
Oct.2001
|
| HDEC(Agip)
|
Iran - South Pars
Phase 4 & 5 (A - ONE)
|
Supervision of piping
and tank,
QA/QC at site for component gas
plant facilities
|
Apr.2003 ~
Sep.2006
|
Sodiff Advanced
Materials |
Sodiff adding Youngju
Plant
|
Third party inspection
of Pressure
Vessel
|
Jan.2004 ~
Dec.2005
|
| TIJD
|
Iran - South Pars
Phase 6,7&8
|
Supervision of piping
and tank,
QA/QC at site for component gas
plant facilities
|
Oct.2004
~
Mar.2007 |
| HDO/HDEC |
U.S.A - HDO
Clean
Fuels Project |
Third party inspection
of Air
Condenser, Air Cooler
|
Dec.2004
~
Jun.2005 |
| HDO/HDEC |
Netherlands
- HDO
Clean Fuels Project |
Third party inspection
of Boiler, Feed
Water Pump
|
Dec.2004
~
Jun.2005 |
| HDO/HDEC |
Japan - HDO
Clean
Fuels Project |
Third party inspection
of Feed Pump,
Valve, Motor
|
Dec.2004
~
Jun.2005 |
Exxon
Mobil
(Poonglim
Industrial) |
Russia, Turkey,
France - Sakhalin
Decastri (Export
Terminal Project) |
Third party inspection
of Incinerator,
Air Conditioner, Chiller, Exhaust Duct
& Fan, Air Cooler, Blower, Pressure
Vessel
|
Mar.2005
~
Dec.2005 |
| SK
Corporation |
SK Ulsan
Harbor
BUOY Facility |
Third party inspection
of Tank &
Equipment
|
Mar.2005
~
Present |
| SKICO(HDEC) |
SK No.2 FCC
Project |
Expediting / Third party
inspection of
Tank & Equipment, Air Cooler
|
Dec.2006
~
Present |
Daewoo
Engineering |
Daesan-GSC
GDC Project |
Expediting / Third party
inspection of
Tank & Equipment, Pressure Vessel
|
Mar.2007
~
Present |
| E-Tech |
DongYang
Poly-sillicon |
Expediting / Third party
inspection of
Tank, Rotating Equipment, Pressure Vessel
|
Aug.2008
~
Present |
|
|
|
|
|
2.
Inspection and Supervision : Power
Plant
|
|
Client
|
Project
|
Description
|
Period
|
|
|
|
|
| POSCO |
LNG HRSG
|
Supervision and inspection
Piping,
Super heater, Piping & Tank and
etc.
|
Jan.1999 ~
Dec.1999
|
|
BBC Korea |
Boryung Thermal
Power Plant
|
Welding inspection of
Generator,
Boiler & Tube and etc.
|
Jun.1996 ~
Jun.2003
|
|
BC Hydro |
Stave Fall Substation
|
Third party inspection
Generator,
Transformer and etc.
|
May.1995 ~
Jun.1998
|
| Black
& Veatch |
Milford, Summersville,
Gateway and Lindsay
Power Plant
|
Third party inspection
of Generator,
Boiler and etc.
|
Jan.2001 ~
Jun.2001
|
| Alstom |
U.A.E - Al Hidd Power
Plant
|
Third party inspection
Generator,
Boiler & Tube, Valve and etc.
|
Sep.2001 ~
Sep.2003
|
|
BC Hydro |
Canada - Stave Fall
Substation
|
Third party inspection
of Generator,
Boiler, Valve etc.
|
Jan.2001 ~
Jun.2001
|
| BC
Hydro |
Taiwan - Stave Fall
Substation
|
Third party inspection
of Transformer,
Panel
|
Nov.2004
~
Feb.2005 |
| BC
Hydro |
China - Stave
Fall
Substation |
Third party inspection
of Motor, Panel
|
Nov.2004
~
Feb.2005 |
| Riley
Power |
China - Boiler |
Third party inspection
of Tube, Boiler
Casing Pipe, Pressure Vessel
|
Dec.2005
~
Present |
| POSCO |
Finex Heat
Combined |
Expediting & Third
party of inspection
of HRSG, Machinery, Steel structure
|
Jan.2006
~
Present |
| ROTEM |
Uljin Nuclear
Power Plant Unit 5&6 |
Expediting & Third
party inspection
of Machinery, Turbine/Generator
|
Aug.2006
~
Nov. 2007 |
Samsung
Everland |
Tangjung
Heatcombined Plant |
Third party inspection
of Generator,
Boiler, Piping
|
Apr.
2008 ~
Present |
Samsung
Everland |
Ulsan Heatcombined
Plant |
Expediting & Third
party inspection
Of Pressure vessel, Piping
|
May.
2008 ~
Present |
|
|
|
|
|
3.
Inspection & Supervision :
Steel Bridge & Steel Building
|
|
Client
|
Project
|
Description
|
Period
|
|
|
|
|
|
POSCO |
Incheon International
Airport
|
Supervision of Fabrication
and Erection Steel structure
|
Apr.2000 ~
May.2003
|
|
Korea Highway
Corporation |
Seohae Grand Bridge
Construction (7.8Km)
|
Supervision of Mechanical
work,
Mechanical component of Steel bridge
|
Apr.1996 ~
Oct.2000
|
Korea
Highway
Corporation |
Andong - Jaecheon
Highway Construction (Joongang Expressway)
|
Supervision of Mechanical
work,
Mechanical component of Steel bridge
|
Jul.1996 ~
Jul.1999
|
| Uigeongbu
City |
National Road No.3
|
Supervision of Fabrication
and Erection Steel bridge
|
Sep.1999 ~
Jan.2000
|
| Ulsan
City |
Mipo - Onsan Road
Construction Project
|
Inspection for the Fabrication
and Erection of Box girder
|
Aug.2000 ~
Dec.2001
|
|
Korea Highway
Corporation |
Kumi - Kumho Highway
Construction (Seoul -Busan Expressway)
|
Supervision of Mechanical
work,
Mechanical component of Steel bridge
|
Nov.2001 ~
Feb.2002
|
| Korea
Highway Corporation |
Daegu - Pohang Highway
Construction
|
Supervision of Mechanical
work,
Mechanical component of Steel bridge
|
Jan.2002
~
Oct.2004 |
| POSCO |
Incheon International
Airport Rail Bridge |
Supervision of Fabrication
and Erection Rail bridge, Box girder
|
Jan.2003
~
Dec.2003 |
Daejon
Regional Construction Management
Office
|
Umsung -
Saenguek Road Expansion |
Supervision of Mechanical
work,
Mechanical component of Steel bridge
|
Mar.2003
~
Sep.2004 |
| Daelim
Industrial |
Yeunyook
Bridge of Noryuck Island |
Inspection for the Fabrication
and Erection of Steel bridge
|
Feb.2004
~
Jan.2005 |
| Korea
Highway Corporation |
Third
building Construction Area of Daegu
- Pohang Highway Construction |
Supervision of Mechanical
work,
Mechanical component of Steel
bridge
|
Mar.2004
~
Aug.2004 |
| Dongil
Engineering Consultants |
Machang Grand
Bridge
(Gwysan - Yanggok) |
Supervision of Mechanical
work,
Mechanical component of Steel bridge
|
Nov.2004
~
Present |
| Daewoo
Engineering |
Kwangyang
Harbor Road Construction |
Inspection for the Fabrication
and Erection of Box girder
|
Nov.2005
~
Apr.2006 |
| Daewoo
E&C |
Shindorim
Multi Building |
Erection Supervision
of Steel structure
|
Jun.2005
~
Present |
| Korea
Highway Corporation |
Supervision
of Steel Bridge (First Area) |
Supervision of Mechanical
work,
Mechanical component of Steel bridge
|
Jun.2006
~
Present |
| Busan
city |
Myeongji
Grand Bridge |
Fabrication & Erection
Supervision of Steel bridge
|
Apr.2007
~
Present |
| Lotte
Construction |
Geogum Grand
Bridge |
Fabrication & Erection
Supervision of Steel bridge
|
May.2008
~
Present |
Daewoo
Engineering |
Geogum Grand
Bridge |
Fabrication & Erection
Supervision of Steel bridge
|
Oct.2008
~
Present |
|
|
|
|
|
4.
Inspection and Supervision : Iron
& Steel Making and Other Project
|
|
Client
|
Project
|
Description
|
Period
|
|
|
|
|
| POSCO |
U.S.A, Mexico,
Philippine, Germany,
France, U.K - POSVEN
|
Third party inspection
of Compressor,
Motor Tower, H/Exchanger, Valve,
Pressure Vessel Drum, Steel
Structure, Piping, Generator, Blower,
Pump
|
Dec.1997 ~
Dec.1999
|
|
POSCO |
China - ZPSS
Expansion Project
|
Expediting & T.P.I
of Feeder, Burner,
Air Compressor, Crane & Hoist, Pump,
Bag Filter, Cooler, Steel Structure,
Vessel & Tank, Hydraulic System,
Fan,
Chiller & etc
|
Mar.2003 ~
Present
|
Chang Won
Special Steel |
AOD Steel Making
Plant
|
Expediting & Third
party inspection of
Machinery, Steel structure
|
Feb.2005 ~
Jun.2006
|
| POSCO |
Finex Plant
|
Third party inspection
of Machinery,
Steel Structure
|
Jul.2005 ~
Oct. 2008
|
| POSCO |
China - HV Mill
|
Third party inspection
of Pressure
Vessel, Steel Structure, Machinery
|
Oct.2005 ~
Dec. 2007
|
|
POSCO |
Italy - HV Mill
|
Third party inspection
of Motor,
Transformer, Panel, Pump
|
Oct.2005 ~
Feb. 2007
|
| POSCO |
Finland - HV Mill
|
Third party inspection
of Motor
|
Oct.2005
~
Feb. 2007 |
| Se-Ah
Besteel |
Bloom CCM |
Third party inspection
of Machinery
|
Feb.2006
~
Aug. 2007 |
| POSCO |
Ukraine -
Forging Plant |
Expediting & Third
party inspection of
Press Machinery
|
May.2006
~
Dec. 2007 |
| Se-Ah
Besteel |
Steel Making
Plant |
Expediting & Third
party inspection of
Ladle Cranes
|
Apr.2006
~
Present |
| K.Z
Engineering |
China - Dalian
Uni Project |
Expediting & Third
party inspection of
Press Machinery
|
Dec.2006
~
Present |
| Hyundai
Steel |
Dajin Integrated
Steel Plant |
Expediting & Third
party inspection of
Machinery
|
Jan.2008
~
Present |
| POSCO(Thai) |
#3 Coil Center |
Shop inspection of domestic
fabricated Machinery
|
Jun.2008
~
Present |
| Asia
steel |
Pyeongtaek
Oil Tank |
Shop inspection of domestic
imported Machinery
|
Aug.2008
~
Present |
| Se-Ah
Besteel |
15,000 ton
Forging Press Shop |
Inspection and Expediting
service
|
Sep.2008
~
Present |
|
|
|
|
|
5.
Manpower Supply : Shipbuilding
& Offshore Facilities
|
|
Client
|
Project
|
Description
|
Period
|
|
|
|
|
Hyundai
Heavy
Industries |
Shipbuilding
|
Containerships, L.N.G
Carriers,
FPSOs, Oil Tankers,
Chemical Tankers
|
Mar.2002 ~
Present
|
Samsung
Heavy
Industries |
Shipbuilding
|
Containerships, L.N.G
Carriers,
FPSOs, Oil Tankers,
Chemical Tankers
|
Jan.1998 ~
Jul.2008
|
STX
Shipbuilding |
Shipbuilding
|
Containerships, L.N.G
Carriers,
FPSOs, Oil Tankers,
Chemical Tankers
|
Apr.2005 ~
Present
|
SPP
Shipbuilding |
Shipbuilding
|
Containerships, L.N.G
Carriers,
FPSOs, Oil Tankers,
Chemical Tankers
|
Oct.2005 ~
Present
|
Hyundai
Samho Heavy
Industries |
Shipbuilding
|
Containerships, L.N.G
Carriers,
FPSOs, Oil Tankers,
Chemical Tankers
|
Apr.2006 ~
Present
|
Daewoo
Shipbuilding &
Marine
Engineering
Co., Ltd. |
B.P Thunder Horse
Semi - Submersible Rig
(British Petroleum)
|
Offshore Facilities
|
Apr.2002 ~
Feb.2004
|
Daewoo
Shipbuilding &
Marine
Engineering
Co., Ltd. |
Sanha Condensate
Complex Platform
(Chevron Texaco)
|
Offshore Facilities
|
Oct.2001
~
May.2004 |
Hyundai
Mipo
Ship-Building |
Shipbuilding |
Containerships, Bulk
Carriers,
Chemical Tankers
|
Apr.2008
~
Presen |
|
|
|
|
|
6.
Manpower Supply : Gas, Refinery
and Petrochemical Plant (Construction
Site)
|
|
Client
|
Project
|
Description
|
Period
|
|
|
|
|
HDEC
(Sirte Oil) |
Libya - Attahaddy
Gas
Project (ATAS)
|
Gas Piping, Tank, Equipment
|
Dec.2000 ~
Aug.2005
|
HDEC
(Total ) |
Iran - South Pars
Phase
2 & 3 (STAS)
|
Gas Piping, Tank, Equipment
|
Dec.2000 ~
Sep.2002
|
HDEC
(Agip) |
Iran - South Pars
Phase
4 & 5 (A - ONE)
|
Gas Piping, Tank, Equipment
|
Apr.2003 ~
Sep.2006
|
Hyundai
Petrochemical |
Netherlands Fuel
Oil Plant
|
Third party inspection
of Boiler,
Pump
|
Jan.2005 ~
Dec.2005
|
KH
Petrotec
(Doojung) |
India - F.C.C Shut
Down
|
Gas Piping, Tank, Equipment
|
Sep.2005 ~
Nov.2005
|
Samsung
Engineering |
Samsung Petrochemical
|
Expediting & Third
party inspection
of Pressure Vessel, Heat Exchanger
|
Jun.2006 ~
Present
|
|
|
|
|
|
7.
Manpower Supply : Industrial Facilities
(Construction Site)
|
|
Client
|
Project
|
Description
|
Period
|
|
|
|
|
| Ebara
Japan |
Vietnam - Tangnong
Water Treatment Plant
|
Third party inspection
of equipment
and material Piping, Tank, Valve
and
Equipment
|
Jun.2003 ~
Dec.2003
|
|
Nowon Industrial |
Taiwan - High
Speed
Rail Project
|
Supervision of fabrication
and
erection steel bridge
|
Sep.2003 ~
Feb.2005
|
|
HDEC |
Hongkong - HCT9
|
Supervision of
mechanical work
Mechanical component of harbor
unloading facilities
|
Sep.2003 ~
Apr.2004
|
| Kolon
E&C |
Vietnam - Thang
Long
North Van Infrastructure
Development Project
|
Third party inspection
of Vacuum
Tank, Surface Washer, Tower,
Neutralization Unit, Fan, Pump,
Thickener, Valve, Mixer &
etc.
|
Jun.2004 ~
Jan.2005
|
|
|
|
|
|
|
 |
|
| ¡¡ |
|
|
|
|